TM 9-2350-238-34-2
2-34. MAINTENANCE OF STAGE FOUR CARRIER ASSEMBLY (CONT).
REASSEMBLY (CONT)
8 Install three planet pinion gears (8) with
two planet gear flat washers (11) each,
in carrier (7).
9 Install three new pins (12) in carrier (7).
NOTE
l If a new carrier is used, drill and
tap
a
0.250-in.(0.635-cm),
28
UNF-2B hole 0.375 in.(0.953 cm)
deep between each gear pin and
carrier.
l If only new pins are used, drill and
tap a new hole between each new
pin and carrier. Drill new holes ap-
proximately 180 degrees from old
holes.
10 Install three new setscrews (13) in car-
rier (7). Tighten and stake each new
setscrew.
2-150