TM 9-2350-238-34-212 Install new control cylinder gasket (16)and winch control cylinder (17) on con-trol cylinder mounting adapter plate (14).Make sure inlet port of winch controlcylinder is positioned as shown.13 Install four new Iockwashers (18) andfour hexagon head capscrews (19). Tor-que hexagon head capscrews to 18 ft-lb(24 N-m).14 Turn cable reel (1) and reaction end sup-port (9) so that open end is upward.15 Install new washer (20) on stage twoboom winch carrier assembly (21).2-57
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business