TM 9-2350-256-20-1
0077 00
CORRECTIVE ACTION Continued
8.
Reconnect main lighting and master relay wiring harness to main lighting switch. Disconnect wire
40 from main lighting and master relay wiring harness connector in switch panel. Place red lead of
multimeter on male connector of wire 40 and black lead to ground. Turn MASTER switch on and check
for voltage. Turn MASTER switch OFF. If voltage is present, repair/replace wire 40 of main lighting
and B.O. selector switch wiring harness (see WP 0218 00). If no voltage is present, repair/replace wire
40 of main lighting and master relay wiring harness (see WP 0219 00).
9.
Place red lead of multimeter in socket F of wire 10/15 and black lead to ground. Turn MASTER switch
on and check for voltage. Turn MASTER switch OFF. If voltage is present repair main lighting switch
(see WP 0159 00). If no voltage is present, go to step 10.
0077 00-7