TM 9-2350-256-20-1
0119 00
Removal
1.
Remove 10 hose assemblies (1) by loosening coupling nut at each end of hose assembly.
2.
Remove two hose assemblies (2) by loosening coupling nut at each end of hose assembly.
3.
Remove hose assembly (3) by loosening coupling nut at each end of hose assembly.
4.
Remove 12 multiple connectors (4) by removing 12 fluid passage bolts (5) and 24 flat washers (6).
5.
Remove tube assembly (7) and tube elbow (8) by loosening coupling nut at each end of tube assembly and removing two
clamps (9).
6.
Remove tube assembly (10) and tube elbow (11) by loosening coupling nut at each end of tube assembly and removing two
clamps (12).
7.
Remove hose assembly (13) by loosening coupling nut at each end of hose assembly.
8.
Remove grommet (14) and two elbows (15).
9.
Remove hose assembly (16) by loosening coupling nut at each end of hose assembly.
10. Remove retaining ring (17), nut (18), clinch sleeve (19), and sealing plug (20).
11. Remove tube cross (21), flat washer (22), and nut (23).
12. Remove three loop clamps (24) by removing three self-locking nuts (25) and three screws (26).
13. Remove hose assembly (27) by loosening coupling nut at each end and removing nut (28), lockwasher (29), and flat washer
(30).
14. Remove hose assembly (31) by loosening coupling nut at each end and removing elbow (32) and check valve (33) from one
end, and tee (34) from other end.
0119 00-2