TM 9-2350-256-20-2
0150 00
16. Install gasket (10) and grille (9) using four lockwashers (12) and four screws (11).
17. Install hose (8) using two clamps (7).
18. Install tube (6) using two screws (3), two lockwashers (4), and bracket (5).
19. Install hose (2) using two clamps (1).
20. Install test cables and hoses. Test run engine prior to installation. Check for proper generator output.
NOTE
Follow-on maintenance: Install powerplant (see WP 0098 00).
END OF WORK PACKAGE
0150 00-9/10 blank