TM 9-2350-256-20-2
0242 00
6.
Connect lead (1) to gage panel to bulkhead wiring harness connector at bulkhead disconnect (13).
7.
Install 14 clamps (10) using lockwasher (12) and screw (11) for each.
NOTE
Follow-on maintenance: Install air cleaner assembly (see WP 0138 00).
END OF WORK PACKAGE
0242 00-5/6 blank