TM 9-2350-256-20-2
UNIT MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
BILGE PUMP POWER LEAD RELAY, MOUNTING PLATE, AND CIRCUIT BREAKER REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Materials/Parts
Equipment Condition
Stowage basket forward intermediate left floor plate
WARNING
Be certain MASTER switch is OFF when working on electrical systems to avoid electrical shock or
burns.
Removal
1.
Disconnect two leads (1 and 2) from circuit breaker (3) by removing two screws (4) and two lockwashers (5).
2.
Disconnect wiring harness (6) from relay (7).
3.
Remove circuit breaker (3) by removing two screws (8) and two lockwashers (9).
4.
Remove relay (7) by removing two screws (10) and two lockwashers (11).
0251 00-1