TM 9-2350-256-20-2
0414 00
7.
Install shoe tree (18) with washer (17), pin (16), two lockwashers (15), and two screws (14).
8.
Install two chains (11) with two pin shackles (13) and two retaining pins (12) each.
9.
Install two pulleys (5) into guard (4), and insert shaft (10) through guard and pulleys.
10. Install wire rope (9) onto shaft (10) with two lockwashers (8), two nuts (7), and two cotter pins (6).
11. Install guide bar (2), spring (3), and two screws (1) to guard (4).
Inspection-Acceptance and Rejection Criteria
1.
Inspect pin and last link of chain for defects and wear.
END OF WORK PACKAGE
0414 00-4