TM 9-2350-256-20-2
0418 00
2.
Remove 10 screws (1), 10 lockwashers (2), hose connecting panel (3) and gasket (4). Discard gasket.
Installation
1.
Install gasket (4) and hose connecting panel (3) with 10 lockwashers (2) and 10 screws (1).
2.
Apply sealant tape to threads and connect hydraulic lines to each side of the bulkhead using port reference tag.
NOTE
Follow-on maintenance: Install hydraulic connections access cover (see WP 0292 00); Install rear
right-side floor plate (see WP 0291 00); Install air cleaner (right side) (see WP 0137 00).
END OF WORK PACKAGE
0418 00-2