SECTION VII: INTERIOR STOWAGETM 9-2350-256-205 Install two hand grenade boxes (1) each with fourscrews (2) and four new lockwashers (3).NOTEFollow-on maintenance: • Install chips tomachine guns andrifles• Install contents toboxes9-98 REPLACE HAND FIRE EXTINGUISHER BRACKETSTHIS TASK COVERSa. Removalb. InstallationINITIAL SET-UPTools:Equipment Conditions:Tool kit, general mechanic's (Appendix C, item 53)• Fire extinguishers removed from brackets (refer toTM 9-2350-256-10)Parts:• Two M2A2 air purifiers and two brackets removed• Lockwashers (13) (Appendix G, item 132)as required (see paragraph 14-2)• Pins, cotter (2) (Appendix G, item 215)a. REMOVAL1 Remove left-side bracket (1) by removing threescrews (2) and three lockwashers (3).9-229
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business