SECTION II: GAGES AND SWITCH PANELS
TM 9-2350-256-20
11 Connect three connectors (29) to switch (26) and two connectors (28) to two switches (25).
12 Install two switches (25), switch (26), and three ID plates (24) using two screws (27) for each.
13 Install ID plate (22) using two new drivescrews (23).
14 Connect connector (21) to indicator light (18).
15 Install indicator light (18) using two screws (19) and two new lockwashers (20).
16 Install gasket (17).
17 Install lamp (16) by depressing and turning clockwise.
18 Install preformed packing (15) and light lens (14).
6-35