TM 9-2350-256-34
0051 00
5.
Tighten four lock screws (19) and locknuts (18) (two each side). After nosepiece is tight, torque screws to 100125 lb-ft
(136169 Nm).
6.
Connect drain line (17).
7.
Connect three large hydraulic lines (16) and six small hydraulic lines (15).
8.
Connect two hydraulic lines (13) to spade control valve (14).
0051 00-28