TM 9-2350-256-34
0058 00
Testing
1.
Connect porta-power and gage to brake cylinder (5).
2.
Stroke should be 3/4 in. (19 mm) at 250500 psi (17243448 kPa), with no leakage.
3.
Check for return stroke while bleeding off pressure.
Installation
1.
Install brake cylinder (5) and four screws (4).
2.
Connect hose (3).
Adjustment
1.
Tighten adjusting screw (2) clockwise to the maximum.
2.
Back off adjusting screw (2) one full turn.
3.
Hold adjusting screw (2) in position and tighten locknut (1).
END OF WORK PACKAGE
0058 00-2