TM 9-2350-256-34
0061 00
Assembly
NOTE
Refer to TM 5-725 for zinc filling methods.
1.
Install ferrule (7) and zinc filling to drum end of cable (6).
2.
Clamp cable (6) in vise with approximately 12 in. (30.5 cm) projecting up.
3.
Hammer sleeve (4) to cable (6), and install tapered plug (5) with small end of plug pointing into center of cable. Place a
cable strand into each plug groove and drive plug into sleeve. Hammer cable strands down onto top of tapered plug and
install clevis (3).
4.
Install bolt (2) and nut (1) to clevis (3).
5.
Lubricate main winch cable in accordance with TM 9-2350-256-10.
Installation
1.
Install main winch cable in accordance with TM 9-2350-256-20.
2.
Check cable level winding on winch drum by operating winch and inspecting cable as it winds on the drum. If cable does
not spool evenly and fully across the drum, adjust level cylinder piston travel (TM 9-2350-256-20).
END OF WORK PACKAGE
0061 00-3/4 blank