TM 9-2350-256-34
0063 00
NOTE
Perform steps 16 thru 20 to remove boom combination control valve.
16. Remove four screws (90) and boom combination control valve (91).
17. Remove two gage ports (92). Do not remove adjustment screw (93).
18. Remove and discard two packings (94) and six packings (95) from boom combination control valve (91).
19. Remove four cotter pins (96), washers (97), two pins (98), and lever (99) from bracket (100). Discard cotter pins.
20. Remove three screws (101), lockwashers (102), and bracket (100) from boom combination control valve (91). Discard
NOTE
Perform steps 21 thru 24 to remove hoist winch control valve.
21. Remove three screws (103) and hoist winch control valve (104).
0063 00-13