TM 9-2350-256-34
0065 00
10. Remove four screws (45) and lockwashers (46). Discard lockwashers. Install shims (48) as required (four places) between
main hydraulic pump (40) and support (47).
NOTE
Step 11 is for horizontal alignment.
11. Slide coupling (32) hubs together with a 1/8-in. (3.2-mm) separation. Tighten setscrews on coupling hubs and check
separation with a feeler gage at four places. If necessary, loosen four screws (45), move main hydraulic pump (40) as
required, and tighten four screws.
12. Install gasket (43) on coupling (32) and slide housings together.
13. Install packing (41) on unloading valve (36).
0065 00-9