14. Install unloading valve (36), flange (39), four lockwashers (38), and screws (37) on main hydraulic pump (40).
15. Install flange (35), four lockwashers (34), and screws (33) on unloading valve (36).
16. Install eight screws (31) and locknuts (30) on coupling (32).
Installation
1.
Attach sling to four lifting eyes (28) and move mechanical transmission and main hydraulic pump assembly (29) through
cupola plate opening into position.
2.
Remove covering and move suction line (23) into position.
3.
Connect drain line (27).
4.
Remove all hydraulic connector opening coverings (26).
5.
Install four packings (25).
6.
Connect four flange-type hoses (22) including suction line (23) and feed line (24) and install 16 lockwashers (21) and
screws (20).