TM 9--2350--292--10OPERATE MAIN WINCH -- CONTINUED0050 00CAUTIONDo not use WINCH OVERRIDE switch (2) to complete mission if main winch auto-matically shuts down. WINCH OVERRIDE switch (2) should only be used after mak-ing sure there is no damage to the main winch, levelwind system, or main winchcable and then only to correct the fault. Failure to comply may result in failure of themain winch or damage to equipment.Once malfunction is cleared, start the main engine if it is not already running.Continue with recovery operations.8. After recovery operations:• If necessary, payout main winch cable.• Maintain tension on cable.NOTEEnsure main winch cable wraps evenly on drum.• Inhaul main winch cable.9. Close main winch lever cover.21END OF TASK0050 00--3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business