TM 9--2350--292--10
0068 00--2
OPERATE M239 SMOKE GRENADE SYSTEM -- CONTINUED
0068 00
LOADING -- CONTINUED
1. Ensure that arming switch (1) is OFF.
2. Remove canvas covers (2) and check that discharger barrels (3) are clear and clean.
3. Remove grenades (4) from six ammunition storage boxes (5).
4. Place grenades (4) into each ammunition storage bin (6) on each side of the hull until mission requires loading in
discharge barrels.
1
5
4
3
2
6