TM 9--2350--292--10
0068 00--3
OPERATE M239 SMOKE GRENADE SYSTEM -- CONTINUED
0068 00
LOADING -- CONTINUED
5. Load six grenades (4) in each discharger (3). Insert grenades, base first, into barrel. Push hard on top of
grenade with palm of hand while rotating grenade 1/4 to 1/2 turn. This will ensure that the spring clip (7) at the
base of the grenade is engaged on pin in bottom of barrel of discharger and assure electrical contact.
7
4
3