TM 9--2350--292--20--10258 00--1ELECTRICAL BULKHEAD CONNECTORS REPLACEMENT0258 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (12) (item 132, WP 0718 00)Lockwashers (8) (item 111, WP 0718 00)Marker tags (item 49, WP 0716 00)Equipment ConditionsVehicle MASTER switch OFF (TM 9--2350--292--10)Battery power disconnected (WP 0256 00)Engine air cleaner assembly removed (WP 0208 00)ReferencesTM 9--2350--292--10NOTETag all electrical connections and electrical leads prior toremoval to aid in installation.Perform Removal steps 1, 2, 3 and 7 and Installationsteps 4, 5 and 6 for maintenance of bulkhead connectorsJ1 thru J5.Perform Removal steps 4, 5, 6 and 7 and Installationsteps 1, 2 and 3 for maintenance of bulkhead connectorJ6.Additional wiring harnesses may need to be removed toaccess faulty electrical bulkhead connector.Removal1. Disconnect wiring harness connector (1) from electrical bulkhead connector (2) in engine compartment.2. Disconnect wiring harness connector (3) from electrical bulkhead connector (2) in crew compartment.3. Remove four screws (4), four lockwashers (5) and electrical bulkhead connector (2) from electrical bulkhead (6).Discard lockwashers.4. Disconnect wiring harness connector (7) from electrical bulkhead connector (8) in engine compartment.5. Disconnect wiring harness connector (9) from electrical bulkhead connector (8) in crew compartment.6. Remove four screws (10) and electrical bulkhead connector (8) from electrical bulkhead (6).7. Inspect parts for damage and replace as required.Figure 7545689321071
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business