TM 9--2350--292--20--10326 00--2LEAD ASSEMBLY 4W140 REPLACEMENT -- CONTINUED0326 00InstallationNOTEGrommet may require splitting before installation.1. Install new grommet (12) in cable chute base subfloor plate (13).2. Place lead assembly 4W140 (11) into mounting position.3. Connect lead assembly 4W140 450A (6) to circuit breaker (7) with screw (4) and two new lockwashers (5).4. Connect lead assembly 4W140 connector P1 (1) to wiring harness 4W100 connector J2 (2) at mounting bracket(3).5. Secure lead assembly 4W140 (11) with five cable clamps (10), five screws (8) and five new lockwashers (9).Figure 139A BC D455671238910BAADC111213NOTEFOLLOW--ON MAINTENANCE:Install stowage baskets #2, #6 and #7 (WP 0465 00)Install subfloor plates #13 (WP 0454 00)Close subfloor plates #17 and #18 (WP 0454 00)Connect battery power (WP 0256 00)END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business