TM 9--2350--292--20--1
0344 00--1
VENTILATOR BLOWER ASSEMBLY REPLACEMENT
0344 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers (3) (item 2, WP 0718 00)
Marker tags (item 49, WP 0716 00)
Equipment Conditions
Vehicle MASTER switch OFF (TM 9--2350--292--10)
Battery power disconnected (WP 0256 00)
References
TM 9--2350--292--10
NOTE
Tag all electrical connections and electrical leads prior to
removal to aid in installation.
Removal
1. Disconnect wiring harness 4W153 connector P4 (1) from ventilator blower (2).
2. Remove two screws (3), screw (4), ground strap (5), three nuts (6), three lockwashers (7), three flat washers (8),
ventilator blower (2) and shim (9). Discard lockwashers.
3. Inspect parts for damage and replace as required.
1
2
3
9
8
7
6
8
7
6
4
5