TM 9--2350--292--20--20621 00--1AUXILIARY POWER UNIT DUCTING REPLACEMENT (HATZ).0621 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (2) (item 10, WP 0718 00)Lockwashers (4) (item 9, WP 0718 00)Gasket (item 100, WP 0718 00)Materials/Parts--ContinuedLockwasher (item 11, WP 0718 00)Lockwashers (5) (item 12, WP 0718 00)Lockwashers (6) (item 2, WP 0718 00)Personnel RequiredTwoReferencesTM 9--2350--292--10NOTEPerform Removal steps 1 and 15 and Installation steps14 and 15 for replacement of engine air cleaner hose.Perform Removal steps 2 through 9 and 15 and Installa-tion steps 7 through 13 for replacement of engine airduct.Perform Removal steps 10, 11 and 15 and Installationsteps 4 through 6 for replacement of engine air cleanerduct.Perform Removal steps 12 through 15 and Installationsteps 1 through 3 for replacement of generator air duct.Removal1. Loosen clamps (1 and 2) and slide both clamps (1 and 2) back over air cleaner hose (3). Remove hose (3) fromfittings at both ends. Remove both clamps (1 and 2) from hose (3).Figure 340231
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business