TM 9--2350--292--20--20621 00--2AUXILIARY POWER UNIT DUCTING REPLACEMENT (HATZ) -- CONTINUED0621 00Removal--ContinuedNOTEThe following steps are performed with the boom raised(TM 9--2350--292--10).2. Remove three screws (4), three lockwashers (5) and cooling air shield (6) from APU cover (7). Discard lockwash-ers.3. Remove four screws (8), four lockwashers (9), four flat washers (10) and screen (11) from cooling air shield (6).Discard lockwashers.4. Remove two screws (12) and two lockwashers (13) securing auxiliary housing (14) to APU cover (7). Discardlockwashers.Figure 3404567891011121314
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business