TM 9--2350--292--20--2AUXILIARY POWER UNIT LEAD ASSEMBLY 3W728 REPLACEMENT --CONTINUED0652 00Installation--Continued2. Route lead assembly 3W728 (3) to generator (5). Install lead assembly 3W728 (3) and wire (4) (tagged for termi-nal E) with three new lockwashers (2) and nut (1, supplied with generator).3. After generator leads are installed, apply adhesive to all exposed terminals.Figure 343132452NOTEFOLLOW--ON MAINTENANCE:Install APU in vehicle (WP 0586 00)END OF TASK0652 00--3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business