TM 9--2350--292--20--20651 00--2AUXILIARY POWER UNIT LEAD ASSEMBLY 3W727 REPLACEMENT (HATZ)-- CONTINUED0651 00Removal -- Continued2. Remove screw (8), springwasher (9), flat washer (10) and lead assembly 3W727 (3) from relay (11). Discardspringwasher.3. Inspect all parts for damage and replace as required.Installation1. Install lead assembly 3W727 (3) on relay (11) with screw (8), new springwasher (9) and flat washer (10).2. Install lead assembly 3W733 (6), wiring harness 3W730 GND lead (5), lead assembly 3W728 (4) and lead assem-bly 3W727 (3) on stud E3 (7) of APU with nut (1) and five new lockwashers (2).3. Apply sealant to exposed electrical terminals on stud E3 (7) and relay (11).12324567891011NOTEFOLLOW--ON MAINTENANCE:Install APU in vehicle (WP 0587 00)END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business