Home
Download PDF
Order CD-ROM
Order in Print
Installation - TM-9-2350-292-20-2_1128
Installation - TM-9-2350-292-20-2_1130
TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
TM 9--2350--292--20--2
0659 00--1
AUXILIARY
POWER UNIT
LEAD ASSEMBLY 3W733 REPLACEMENT (HATZ)
0659 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers (5) (item 127, WP 0718 00)
Adhesive (item 81, WP 0716 00)
Materials/Parts -- Continued
Marker tags (item 49, WP 0716 00)
Lockwashers (3) (item 38, WP 0718 00)
Self--locking nut (item 282, WP 0718 00)
Equipment Conditions
APU removed from vehicle (WP 0587 00)
Removal
NOTE
Tag all
electrical connections
and electrical leads prior to
removal to aid in installation.
Where applicable, remove sealant to expose designated
electrical terminals.
1. Remove nut (1), five
lockwashers
(2), wiring harness 3W730 (3), wiring harness 3W728 (4), wiring harness
3W727 (5) and wiring harness 3W733 (6) from grounding stud E3 (7). Discard lockwashers.
2. Remove self--locking nut (8), three
lockwashers
(9), wiring harness 3W711 (10) and wiring harness 3W733 (11)
from
generator
terminal (12). Discard self--locking nuts and lockwashers.
3. Inspect parts for damage and replace as required.
1
2
3
2
4
5
6
8
9
9
10
11
9
12
7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business