Home
Download PDF
Order CD-ROM
Order in Print
Installation (cont) - TM-9-2350-292-20-2_29
TRANSMISSION BRACKET ASSEMBLY REPAIR
TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
1
2
3
4
5
6
7
8
9
10
11
TM 9--2350--292--20--2
TRANSMISSION OIL SAMPLING VALVE REPLACEMENT
0346 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0717 00)
Materials/Parts
Sealing compound (item 16, WP 0716 00)
Equipment Conditions
Engine deck doors opened (TM 9--2350--292--10)
References
TM 9--2350--292--10
Removal
1. Remove oil sampling valve (1) from bushing (2).
2. Remove bushing (2) from transmission (3).
3. Inspect parts for damage and replace as required.
Installation
1. Apply sealing compound to male pipe threads of bushing (2).
2. Install bushing (2) in transmission (3).
3. Apply sealing compound to male pipe threads of oil sampling valve (1).
4. Install oil sampling valve (1) in bushing (2).
Figure 157
1
2
3
FORWARD
NOTE
FOLLOW--ON MAINTENANCE:
Close engine deck doors
(TM 9--2350--292--10)
END OF TASK
0346 00--1/2 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business