TM 9--2350--292--20--2
0589 00--3
AUXILIARY POWER UNIT (APU) GROUND HOP KIT (HATZ) -- CONTINUED
0589 00
Installation--Continued
8. Connect wiring harness 5W901 (22) to wiring harness 3W704 connector P1 (23) and wiring harness 3W702 con-
nector J2 (24).
9. Connect wiring harness 5W907 (25) to wiring harness 3W711 connector P1 (26) (except ground (GND)) and wir-
ing harness 3W702 connector J1 (27) (except (GND)).
10. Connect lead assembly 5W900 (28) to lead assembly 3W728 (29) with screw (30), lockwasher (31), and nut (32).
11. Connect lead assembly 5W900 (28) to bulkhead ground lug (33) with screw (34) and lockwasher (35).
Removal
1. Remove screw (34), lockwasher (35) and lead assembly 5W900 (28) from bulkhead ground lug (33).
2. Remove screw (30), lockwasher (31), nut (32) and lead assembly 5W900 (28) from lead assembly 3W728 (29).
3. Disconnect wiring harness 5W907 (25) from wiring harness 3W711 connector P1 (26) (except ground (GND)) and
wiring harness 3W702 connector J1 (27) (except (GND)).
4. Disconnect wiring harness 5W901 (22) from wiring harness 3W704 connector P1 (23) and wiring harness 3W702
connector J2 (24).
28
35
34
30
29
28
31
32
25
26
22
23
33
24
27