TM 9--2350--292--20--2AUXILIARY POWER UNIT WIRING HARNESS CABLE CLAMPSREPLACEMENT0592 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (2) (item 287, WP 0718 00)Equipment ConditionsAPU engine duct removed (WP 0622 00or WP 0623 00)Removal1. Remove two screws (1), two lockwashers (2) and cable clamps (3 and 4) securing two wiring harnesses (5) toAPU assembly (6). Discard lockwashers.2. Inspect parts for damage and replace as required.InstallationSecure two wiring harnesses (5) to APU assembly (6) with cable clamps (3 and 4), two screws (1) and two new lock-washers (2).Figure 33312312465NOTEFOLLOW--ON MAINTENANCE:Install APU engine duct (WP 0622 00 or WP 0623 00)END OF TASK0592 00--1/2 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business