TM 9-2350-238-34-2ADJUSTMENT l Make sure all personnel stand clear when operating boom to avoid injury to personnel.l When testing hydraulic system, be sure boom is in stowed position as failure of systemmay result in injury to personnel.NOTESteps 1 thru 5 are written for onepressure relief valve, but apply to allthree.1 Adjust check valve. Refer to page 2-179.2 Turn off hydraulic system (TM9-2350-238-10).3 Remove manifold tee tube cap (1) fromvalve tube tee (2).4 Install 500 psi (3448 Pa) oil pressuretester on valve tube tee (2).OIL PRESSURETESTER2-167
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business