TM 9-2350-238-34-22-47. MAINTENANCE OF CAB TRAVERSING UNIT AND PRIMARY PLANETARY SPEEDGEAR ASSEMBLY (CONT).REASSEMBLY(CONT)26 Install traversing gear-slip clutch (45) inmechanical gear housing (46).27 Apply sealing compound (item 20, appxB) to threads of four socket head cap-screws (47).28 Install Internal gear (13) in mechanicalgear housing (46) and secure with foursocket head capscrews (47) Torquescrews to 23 to 25 ft-lb (31 to 34 N-m)29 Install primary planetary speed gearassembly (7) In mechanical gear housing(46). Aline gears using 3/16-in. rods (48)placed through index holes In primaryplanetary speed gear assembly.2-244
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business