TM 9-2350-238-34-22-47. MAINTENANCE OF CAB TRAVERSING UNIT AND PRIMARY PLANETARY SPEEDGEAR ASSEMBLY (CONT).REASSEMBLY(CONT)35 Install new preformed packing (55) andtube nipple (56) in oil seal retainer (52),36 Apply sealing compound (item 20, appxB) to ten socket head capscrews (57).37 Install new upper gear housing gasket(58) and brake clutch traversing housing(39) to mechanical gear housing (46).Secure with ten socket head capscrews(57). Torque screws to 23 to 25 ft-lb(31 to 34 N-m).38 Install machine key (59), drive pinionspur gear (60), flat washer (61), slottedhexagon nut (62), and new cotter pin(63) to traversing hydraulic motor (64).2-246
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business