TM 9-2350-238-34-2
2-47. MAINTENANCE OF CAB TRAVERSING UNIT AND PRIMARY PLANETARY SPEED
GEAR ASSEMBLY (CONT).
REASSEMBLY(CONT)
35 Install new preformed packing (55) and
tube nipple (56) in oil seal retainer (52),
36 Apply sealing compound (item 20, appx
B) to ten socket head capscrews (57).
37 Install new upper gear housing gasket
(58) and brake clutch traversing housing
(39) to mechanical gear housing (46).
Secure with ten socket head capscrews
(57). Torque screws to 23 to 25 ft-lb
(31 to 34 N-m).
38 Install machine key (59), drive pinion
spur gear (60), flat washer (61), slotted
hexagon nut (62), and new cotter pin
(63) to traversing hydraulic motor (64).
2-246