34Install shift rod spool assembly (38) andwinch shift rod (40) into cable reel (1)through motor end until winch shift rodcomes through brake rod of stage oneboom winch carrier assembly (24) atreaction end of cable reel.TM 9-2350-238-34-2ADJUSTMENT 1234567Hydraulic system is under highpressure. Follow hydraulic systemsafety procedures to prevent injury(TM 9-2350-238-20-2). Wipe upspilled hydraulic fluid.Refer to TM 9-4940-468-14 for test setupand testing procedures.Connect a hydraulic line to inlet port ofwinch control cylinder (1).Back off two hexagon plain nuts (2 and 3)to end of threads on brake rod of stageone boom winch carrier assembly (4).Apply and hold 200 psi (1379 kPa)pressure on winch control cylinder (1).Tighten hexagon plain nut (2) until allslack is taken up.Tighten hexagon plain nut (2) an addi-tional 1-1/2 turns, and secure hexagonplain nut in place with other hexagon plainnut (3).Release hydraulic pressure and removehydraulic line from winch control cylinder(1).2-63
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business