TM 9-2350-238-34-22-27. MAINTENANCE OF STAGE THREE BOOM WINCH CARRIER ASSEMBLY (CONT).4 Install new preformed packing (5) to reac-NOTEtion shaft of clutch release carrier (3).5 Coat bores of three spur gears (6) withgrease (item 9, appx B).6 Install three rows of 68 new roller bear-ings (7), separated by one new sleevespacer (8), into each bore of three spurgears (6).7 Install two flat washers (9) over each endof three spur gears (6).8 Hold each of three spur gears (6) in placein clutch release carrier (3), and securespur gears with three new planet gearpins (10).l if a new clutch release carrier isused, drill and tap a 0.250-in.(0.635-cm), 28 UNF-2B hole0.375 in. (0.953 cm) deep be-tween each planet gear pin andclutch release carrier.l If only new planet gear pins areused, drill and tap a new hole be-tween each new planet gear pinand clutch release carrier. Drillnew holes approximately 180 de-grees from old holes.9 Install three new setscrews (11). Tightenand stake each new setscrew.2-83
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business