TM 9-2350-238-34-22-26. MAINTENANCE OF STAGE TWO BOOM WINCH CARRIER ASSEMBLY (CONT).REASSEMBLY (COIVT)4 Using arbor press, install new roller bear-ing (4) in each of three spur gears (5).5 Install two pinion gear flat washers (6) oneach of three spur gears (5).6 Install three spur gears (5), with two pi-nion gear flat washers (6) each, in carrier(3).7 Install three new planet gear pins (7) incarrier (3).NOTE. If a new carrier is used, drill andtap a 0.250-in. (0.635-cm), 28UNF-2B hole 0.375 in. (0.953 cm)deep between each planet gearpin and carrier.l If only new pins are used, drill andtap a new hole between each newplanet gear pin and carrier. Drillnew holes approximately 180degrees from old holes.8 Install three new setscrews (8) in tappedholes. Tighten and stake each new set-screw.2-80
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business