TM 9-2350-238-34-2
7 Install two planet gear annular ball bear-
ings (9) and two planet gear flat washers
(10) in each of three spur gears (11).
Make sure each planet gear headless
straight pin is installed in the same
hole from which it was removed
during disassembly.
8 Install three spur gears (11), with two
planet gear annular ball bearings (9) and
two planet gear flat washers (10) each, in
carrier (2) and secure in place with three
planet gear headless straight pins (12).
NOTE
l If a new carrier is used, drill and
tap a 0250-in. (0.635-cm), 28
UNF-2B hole, 0.375 in. (0.953
cm) deep between each gear
headless straight pin and carrier.
l If only new gear headless straight
pins are used, drill and tap a new
hole between each new gear
headess straight pin and carrier.
Drill new holes approximately 180
degrees from old holes.
9 Install three setscrews
stake each setscrew.
(13). Tighten and
2-75