TM 9-2350-238-34-27 Install two planet gear annular ball bear-ings (9) and two planet gear flat washers(10) in each of three spur gears (11).Make sure each planet gear headlessstraight pin is installed in the samehole from which it was removedduring disassembly.8 Install three spur gears (11), with twoplanet gear annular ball bearings (9) andtwo planet gear flat washers (10) each, incarrier (2) and secure in place with threeplanet gear headless straight pins (12).NOTEl If a new carrier is used, drill andtap a 0250-in. (0.635-cm), 28UNF-2B hole, 0.375 in. (0.953cm) deep between each gearheadless straight pin and carrier.l If only new gear headless straightpins are used, drill and tap a newhole between each new gearheadess straight pin and carrier.Drill new holes approximately 180degrees from old holes.9 Install three setscrewsstake each setscrew.(13). Tighten and2-75
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business