TM 9-2350 -238-34-22-25. MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY (CONT).DISASSEMBLY (CONT)8 Remove sun gear shift rod lock flatwasher (12) from carrier (5).9 Remove sun gear bearing retaining ring(13) and brake rod (14) from carrier (5).10 Remove sun gear shift rod lock hexagonplain nut (15) and thrust ball bearing (16)from brake rod (14).2-72
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business