TM 9-2350-238-34-22-25. MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY (CONT).REASSEMBLY (CONT)10 Install spur gear (14) in carrier (2). Meshteeth of spur gear with teeth of threespur gears (11 ) inside carrier.11 Install sun gear shift rod lock flat washer(15) and carrier brake ring (16) in carrier(2).12 Install eight machine bolts (17). Tightenmachine bolts and install new Iockwire(18) to carrier brake ring (16).2-76
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business