TM 9-2350-238-34-22-25. MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY (CONT).REASSEMBLY (CONT)4 Install thrust ball bearing (4) and sun gearshift rod lock hexagon plain nut (5) onbrake rod (6). Stake sun gear shift rodlock hexagon plain nut.5 Install brake rodsecure with sun(7).(6) in carrier (2) andgear bearing retaining ring6 Install sun gear shift rod lock flat washer(8) in carrier (2).2-74
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business