TM 9-2350-238-34-22-26. MAINTENANCEDISSASSEMBLY (CONT)OF STAGE TWO BOOM WINCH CARRIER ASSEMBLY (CONT).2 Using hammer and drift, remove threeplanet gear pins (3) from carrier (2).3 Remove three spur gears (4) from carrier(2).4 Remove two pinion gear flat washers (5)from each of three spur gears (4).5 Using arbor press, remove one roller bear-ing (6) from each of three spur gears (4).2-78
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business