TM 9-2350-256-102-11. OPERATING PROCEDURES-Continued.(d)Have operator pay outhoist cable (9). Passcable over top of crewcompartment andunder boom crossmembers (10). Keephoists cables betweenstaylines (11).(e)Pass cable (9) up andover left side of boomsupport (12).(f)Bring cable (9) back, going up and over left boom pulley (13).(g)Pull cable (9) forward and lay it on the lower pulley (14) of 25-ton (22.7-metric-ton) snatch block fromleft to right.(h)If rigging a two-part line using 10-ton (9.1-metric-ton) snatch block, close boom safety latch, hook upline to boom dead man (see para. 2-11e(2) m) and close block.NOTEIf rigging a 25-ton (22.7-metric-ton) snatch block with a four-part line, continuewith following steps.(i)Bring cable (9) back over upper boom cross member (15) and down under boom pulley assembly(16).(j)Pull cable (9) up and over right boom pulley (17).2-136
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business