TM 9-2350-256-102-11. OPERATING PROCEDURES-Continued.NOTEThe vehicle can move with a load of up to 6 tons (5.4 metric tons) hanging fromboom. Moving loads of 6 to 20 tons (5.4 to 18.1 metric tons) requires lockoutblocks. See paragraph 2-11g for instructions on lockout block installation.(c)Live boom operation is used to move boom 1 to 4 ft (0.3 to 1.2 m) back from the full forward position.This is for spotting (placing) loads during recovery or maintenance operations. Refer to illustrationbelow for live boom operation.CAUTION·Only use BOOM operating lever when retracting boom during live operation, donot use BOOM SAFETY lever.·Maximum lift or live boom operation not to exceed 50,000 lb (22,680 kg).(d)Use APU to lower boom when powerplant is removed. Place 2 in. x 4 in. (51 mm x 102 mm) woodblocks on air cleaner outlet cover to support boom when engine deck is removed.2-140
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business