TM 9-2350-256-10(k)Close boom pulley safety latch (8).(l)Bring cable (9) forward and lay it in upper pulley (18) of block from left to right.(m)Pull cable (9) toward boom pulley and secure it to dead man (19).(n)Close snatch block. Replace and tighten screw (3).WARNINGDo not use 25-ton (22.7-metric-ton) snatch block if screw (3) is not installed. Ifthere is no hole in hinge for screw, immediately notify unit maintenance forinstallation. Failure to secure clevis to hinge with screw could result in release ofsnatch block during lifting operations possibly causing death.2-137
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business