TM 9-2350-256-10(e)Release both levers (2 and 3) when boom is fully raised. They will return to their normal positions.(4)Precautionstofollowwhenraisingboom.(a)Chains supporting tie block arenot allowed to snag on J-hook(see para. 2-11e).(b)Ensure cables (see para. 2-11e)do not snag when raising boom.(c)Keep all ropes, stayline cables,and other equipment from catching on deck door hinges and handles to avoid damage and injury.(5)Operatingboom.WARNINGIf powerplant is removed andAPU is nonoperational, leaveboom in full raised position.Do not attempt to lowerboom; damage could occur.(a)To move boom back 4 ft (1.2 m), move BOOM operating lever (1) to RETRACT-STOW.(b)To move boom forward, move BOOM operating lever (1) to FORWARD.NOTEWhen bringing boom all the way back (more than 4 ft [1.2 m]), operate BOOMSAFETY control (2) and BOOM operating (1) levers to bring it forward again.2-139
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business