TM 9-2350-256-20-1
0064 00
CORRECTIVE ACTION Continued
7.
Reconnect wire 27 at Y-connector. Install main switch panel (11), flat washer (10), ground lead (9),
three lockwashers (8), and three screws (7) to mounting brackets. Remove three screws (1), three
lockwashers (2), two screws (3), two lockwashers (4), and ground strap (5) and release gage panel (6)
from mounting brackets.
Disconnect switch panel to gage panel and miscellaneous switches wiring harness from gage panel.
Place red multimeter on socket K and black lead to ground. Turn MASTER switch on and check for
voltage. Turn MASTER switch OFF. If voltage is present, go to step 12. If voltage is not present,
repair/replace wire 27 of switch panel to gage panel and miscellaneous switches wiring harness (see
WP 0204 00 for dual voltage; 0205 00 for single voltage).
0064 00-7