TM 9-2350-256-20-1
0080 00
CORRECTIVE ACTION Continued
11. Reconnect switch panel to gage panel and miscellaneous switches wiring harness to main switch panel.
Install main switch panel (11), flat washer (10), ground lead (9), three lockwashers (8), and three screws
(7). Open air inlet doors. Disconnect wire 48 pin A from bulkhead to master relay wiring harness.
Place red multimeter lead in socket and black lead to ground. Turn MASTER switch on and check for
voltage. If voltage is present, repair/replace switch panel, radio, and bilge pump to bulkhead wiring
harness (see WP 0202 00). If voltage is not present, troubleshoot master relay circuit (see WP 0042 00).
END OF WORK PACKAGE
0080 00-9/10 blank