TM 9-2350-256-20-1
0083 00
CORRECTIVE ACTION Continued
11. Reconnect switch panel to gage panel and miscellaneous switches wiring harness to main switch panel.
Install main switch panel (15), flat washer (14), ground lead (13), three lockwashers (12), and three
screws (11). Open air inlet doors (TM 9-2350-256-10). Disconnect wire 48 pin A from bulkhead
to master relay wiring harness. Place red multimeter lead in socket and black lead to ground. Turn
MASTER switch on and check for voltage. If voltage is present, repair/replace switch panel, radio, and
bilge pump to bulkhead wiring harness (see WP 0202 00). If voltage is not present, troubleshoot master
END OF WORK PACKAGE
0083 00-9/10 blank