TM 9-2350-256-20-1
0092 00
CORRECTIVE ACTION Continued
25. Reconnect switch panel to gage panel and miscellaneous switches wiring harness to main switch panel.
Install main switch panel (5), flat washer (4), ground lead (3), three lockwashers (2), and three screws
(1) to mounting bracket. Open air inlet door. Disconnect wire 48 pin A from bulkhead to master relay
wiring harness. Place red multimeter lead in socket and black lead to ground. Turn MASTER switch
on and check for voltage. Turn MASTER switch OFF. If voltage is present, repair/replace switch
panel, radio, and bilge pump to bulkhead wiring harness (see WP 0202 00). If voltage is not present,
END OF WORK PACKAGE
0092 00-15/16 blank